BMS Upgrade for New/Indy Catawba Plant in Catawba, SC

HFC has been commissioned to upgrade the BMS control system for a paper mill in Catawba, South Carolina. These are recovery and combination boilers that fire gas, oil, black liquor and wood chips.

New/Indy Catawba plant has had HFC equipment installed since 1984 and as technology has advanced over the years has gone through several upgrades, improving plant performance as well as operator interface.

The Final Acceptance Testing (FAT) will be completed in Dallas, Texas in November 2021. The current plan for installation of the equipment at the site will be in March 2022.